1
Bridge Construction of Serbia Rapid Road and Bridge Culvert Project.
Investor: Shandong Luqiao Group Co. Ltd OGRANAK BEOGRAD-Novi Beograd
Drainage works of the Works of the Access Road at Nova Pazova station and Road Grade Separation at km26+392,67
Investor: China Railway 21st Bureau Group Co. Ltd OGRANAK BEOGRAD
Works on Drainage, Dewatering and Relocation of the Sanitary Sewer in Sector 6
Project: Belgrade Bypass Project Construction of the Highway E70/E75, Section: Bridge over Sava River near Ostružnica – Bubanj Potok
Investor: AzVirt Ogranak Beograd
Pile Foundation Construction of Serbia Valjevo Rapid Road and Bridge Culvert Project, Investor Shandong Luqiao Group Co. Ltd Ogranak Beograd
Installation of overpass on the road “Kasarna-Topcider”.
GSM-R Network Towers, Investor China Railway 21st Bureau Group Co. Ltd Belgrade Branch:
» KM0 + 709 Exit portal "Senjak"
» KM3 + 150.53 Railway Station "New Belgrade"
» KM5 + 534.51 Station "Tosin Bunar"
» KM7 + 506.39 "Bežanijska Kosa"
» KM9 + 097.99 Station "Zemun"
Design of GSM-R Towers.
Investor – Prosistem Inženjering Tim d.o.o.
Location:
» Batajnica km19+277,18
» Nova Pazova km27+080,38
Plate gaps on the track line Batajnica - Stara Pazova KM19 + 440, KM32 + 036, KM32 + 727, Investor China Railway 21st Bureau Group Co. Ltd. Belgrade Branch
Road grade separation at km26+392,67 of Railway line Batajnica – Stara Pazova, Investor China Railway 21st Bureau Group Co. Ltd. Belgrade Branch
Access road to Nova Pazova railway station, Investor China Railway 21st Bureau Group Co. Ltd. Belgrade Branch
Production of building layer on the highway E-70 / E-75 Belgrade Bypass, Investor Power Construction Corporation Of China